Plant

100% inspection

No bottle leaves the plant without being checked.

Step 05 of 07
Illustrative images

05·100% inspection

From drying to the carton

  1. 01

    Drying

    Bottles are dried as they leave the autoclave.

  2. 02

    Leak test

    Every bottle is tested to detect the smallest leak.

  3. 03

    Visual inspection

    The solution and the bottle are checked under light.

  4. 04

    Overwrapping and boxing

    Leaflet and certificate inserted, carton closed and labelled.

  5. 05

    Automatic rejection

    Cartons with the wrong weight or label are removed automatically.